MDC – Lio Jetty Project

Owner/Client:
- Makati Development Corporation
Scope of Work:
- Structural Works & Electrical Rough-ins with EOT on Prelims
Location:
- El Nido, Palawan
Quantities:
- RC Precast Piles: 190pcs
- Maximum dimension : 450 mmX450mm
- Maximum Length : 20.8mm
- Total Concrete Volume : 1,455mᶟ
Duration:
- April 1, 2016 – April 28, 2017