STEAG – Mindanao 210mw Net Coal-Fired Power Plant, Jetty (45,000DWT)


30 STEAG

Owner/Client:

  • STEAG – State Power, Inc.

Scope of Work:

  • Design and construction of Jetty Facilities Project

Location:

  • Phividec Industrial Estate, Villanueva Misamis Oriental

Quantities:

  • Steel Pipe Piles – 1,815 tons.
  • Unloading Jetty – 12000X192000
    • Diameter – 900mm, t16/14, SKK400
  • Mooring Dolphin Diameter – 900mm, t16/14, SKK400
  • Catwalk Pier Diameter – 900mm, t16/14, SKK400
  • Conveyor Pier Diameter – 500mm, t9, SKK400
  • Conveyor Foundation – Drive PC Piles, 400mmX400mm
  • Concrete – 3,000 psi

Duration:

  • 532 Calendar Days (February 2004 – July 2005)