Minglanilla Port Upgrading Project

Owner/Client:
- Primary Structures Corporation
Scope of Work:
- Pile Driving Works (Lease of Piling Barge including
Piling Crew)
Piles Driven:
- Spun Piles (Round PC Piles) – Dia. 800mm X
38m long = 143nos. - Square PC Piles – 450 X 450mm X 44m long = 187nos.
Duration:
- April – September 2017