Minglanilla Port Upgrading Project


mingla

Owner/Client:

  • Primary Structures Corporation

Scope of Work:

  • Pile Driving Works (Lease of Piling Barge including
    Piling Crew)

Piles Driven:

  • Spun Piles (Round PC Piles) – Dia. 800mm X
    38m long = 143nos.
  • Square PC Piles – 450 X 450mm X 44m long = 187nos.

Duration:

  • April – September 2017
JRE Lofo

D-U-N-S® Number

7 1 - 8 8 0 - 5 5 5 9

ISO