PMSC – RENEWAL OF SHIPLOADER (CIVIL WORKS)



Owner / Client: Philippine Mining Service Corporation
Location: Brgy. Pugalo, Alcoy, Cebu
Scope of Works: Construction of the Trestle Pier C-1A
Construction of the Trestle Pier C-2A
Construction of Shiploader Platform C-3A
Quantities: Steel Pipe Piles
Steel Pipe PilesSteel Pipe PilesSteel Pipe PilesSteel Pipe PilesSteel Pipe Piles
SPP 900mmØ = 108 Tons
SPP 1000mmØ = 327 Tons
Structural Concrete (Cost in Site 4000 PSI) = 283 m³
Cathodic Protection (10 years) = 69 Nos.
Pile Driving = 1,234 m
Duration: December 9, 2017 – June 30, 2018

JRE Lofo

D-U-N-S® Number

7 1 - 8 8 0 - 5 5 5 9

ISO