Restoration of PMSC Bohol Plant Port Facilities Project – 55,000DWT


23 Bohol Restoration Project

Owner/Client:

  • Philippine Mining Service Corporation

Scope of Work:

  • Construction of One (1) Unit (PF) Platform for Ship-Loader
  • Construction of One (1) Unit (MD) Mooring Dolphin
  • Construction of Six (6) units (BD) Breasting Dolphins
  • Construction of Three (3) Units (TP) Trestle Pier
  • Construction of Eleven (11) Units (CP) Catwalk Pier
  • Installation of Anchor Bolts for Ship-Loader
  • Installation of Eight (8) Units Rubber Fenders
  • Installation of Seven (7) Units 100T Bollards
  • Installation of Twenty One (21) Spans Catwalk Structures
  • Installation of Two (2) Structural Stairs

Location:

  • Barangay West Canayoan, Garcia-Hernandez, Bohol, Philippines

Quantities:

  • Steel Pipe Piles – 96pcs. and 1,314,847 tons.
  • Maximum Diameter – 900mm
  • Maximum Thickness – 16/12mm
  • Maximum Length – 46m
  • Concrete – 1260 cu.m.

Duration:

  • March 2015 – January 2016